Before measuring the site work, what is required of the estimator?

  1. To consult with the project manager

  2. To assess excavation requirements based on various data

  3. To prepare a detailed report

  4. To finalize the project cost estimates

The correct answer is: To assess excavation requirements based on various data

An estimator must assess excavation requirements based on various data before measuring site work. This assessment is crucial as it involves understanding the existing site conditions, soil types, and any potential challenges that may arise during excavation. Gathering this information ensures that the estimator can accurately calculate the volume of earth to be moved, identify necessary equipment, and account for labor costs effectively. In addition to excavation requirements, this step often includes evaluating geological surveys, previous site conditions, and any relevant environmental regulations. The insights gained through this assessment directly influence the accuracy of subsequent measurements and estimates. Ultimately, thorough preparation and analysis of excavation needs lay the groundwork for a successful estimating process and help prevent cost overruns and project delays.